Back to the Xavier Musketeers Newsfeed

Henderlong Leads Xavier to 1-0 Overtime Win vs Chicago State

CINCINNATI - golden goal in the 93rd minute gave the Musketeers a 1-0 overtime win over Chicago State on Friday night at Corcoran Field.

The Musketeers moved to 4-1 on the year, while the Cougars dropped to 2-2-1.

93' | XU | ()

• scored his third goal of the season and first game-winning goal. He now has 17 career goals (six game-winning goals).

• Xavier held a 10-2 advantage in shots (7-1 in shots on goal). paced the team with three shots (two on goal), while and each added two shots.