Back to the Florida State Seminoles Newsfeed

WATCH: Drone footage of Doak Campbell renovation, football-only facility progress

Florida State football’s facilities are getting a facelift.

Doak Campbell Stadium has been undergoing renovations since the conclusion of the 2023 season, with the stadium to feature limited seating in the 2024 season ahead of the anticipated 2025 finish date.

Additionally, the university finally kicked off construction of its football-only facility after breaking ground on the future site of the 150,000-square-foot building set to house operational and amenity spaces for players and personnel including:

  • Dedicated football training facility attached to the existing Dunlap Athletic Training Center
  • 13 position meeting rooms
  • Indoor walk-thru meeting area adjacent to position meeting rooms
  • Locker room
  • Dedicated recruiting lounge/suite
  • Offices for Football Coaching Staff
  • Private Event Space
  • Strength Training and Weight Room Centers that include:
  • Walk-thru recovery pools
  • Custom hot/cold plunge pools
  • Underwater treadmill pools
  • Dedicated recovery suite
  • Cryotherapy, hyperbaric chamber, high altitude room
  • Team Meeting Rooms
  • Player development areas
  • Virtual Reality/Performance Enhancement Areas
  • Nutrition/Fueling Stations
  • Coaches Video/Production Offices

Want a peek into the progress?